How Is It Different

Perma-Jack uses high-pressure equipment to install steel reinforcement from inside the building... so no expensive excavation is required and the Perma-Jack System can be installed year round. (Perma-Jack can also be installed from the outside, where desirable, with minimum excavation and all lawn, shrubbery, etc., being quickly returned to its original condition.)

It is based on a process which uses steel piers similar to those used under many large office buildings and highway overpasses... a much stronger and long-lasting solution than older methods or those that don't reach load bearing strata for support. EACH PIER IS INDIVIDUALLY HYDRA-TESTED®.

Some other systems may claim to use similar techniques, but no other method can claim having revolutionized the industry.